Latest news

Manufacturers reduce production time to eight hours daily


The Manufacturers Association of Nigeria has raised the alarm over the crippling impact of persistent power outages on industrial productivity, complaining that most manufacturers are now unable to operate beyond eight hours daily.

MAN Director-General, Segun Ajayi-Kadir, told The PUNCH how energy challenges contributed to the decline manufacturers faced amid escalating costs and unreliable electricity supply.

Ajayi-Kadir noted that the situation, exacerbated by repeated national grid collapses, has left manufacturers grappling with unsold inventory worth over N1.2tn and forced many to rely on costly generator power.

“Power remains very high,” he asserted. “The cost of power remains very high and you will be aware that it has been difficult even to sustain supply in the last three to four weeks. I mean, this is what we have said over time.

“Now, because there is a high level of unsold inventory, I think up to N1.2tn, manufacturers are not even producing. Very few produce more than eight hours a day, and most of them are not metered. So they are being made to pay this high cost for even power that is inadequate or unavailable.”

Nigeria has suffered recurring national grid failures that interrupt production schedules and damage critical machinery, pushing many businesses to seek alternative energy sources.

The PUNCH reported on November 6, 2024, that the national grid has collapsed 10 times since January and that within one week in October, the grid collapsed three times.

According to Ajayi-Kadir, “All these outages and the collapse of the national grid constitute a huge challenge. This is why many people would rather go for the use of generators where they can be sure of a steady and adequate supply of power.”

The MAN DG urged the Federal Government to incentivise alternative energy solutions and collaborate with sub-national entities and private sector players to address the power crisis.

He called for the full implementation of reforms enabled by the amendment to the Power Act, stressing the need for long-term solutions to stabilise electricity supply and reduce costs.

Tags :

Related Posts

Must Read

Popular Posts

The Battle for Africa

Rivals old and new are bracing themselves for another standoff on the African continent. By Vadim Samodurov The attack by Tuareg militants and al-Qaeda-affiliated JNIM group (Jama’a Nusrat ul-Islam wa al-Muslimin) against Mali’s military and Russia’s forces deployed in the country that happened on July 27, 2024 once again turned the spotlight on the activities...

I apologise for saying no heaven without tithe – Adeboye

The General Overseer of the Redeemed Christian Church of God, Pastor Enoch Adeboye, has apologised for saying that Christians who don’t pay tithe might not make it to heaven. Adeboye who had previously said that paying tithe was one of the prerequisites for going to heaven, apologised for the comment while addressing his congregation Thursday...

Protesters storm Rivers electoral commission, insist election must hold

Angry protesters on Friday stormed the office of the Rivers State Independent Electoral Commission, singing and chanting ‘Election must hold’. They defied the heavy rainfall spreading canopies, while singing and drumming, with one side of the road blocked. The protest came after the Rivers State governor stormed the RSIEC in the early hours of Friday...

Man who asked Tinubu to resign admitted in psychiatric hospital

The Adamawa State Police Command has disclosed that the 30-year-old Abdullahi Mohammed who climbed a 33 kv high tension electricity pole in Mayo-Belwa last Friday has been admitted at the Yola Psychiatric hospital for mental examination. The Police Public Relations Officer of the command SP Suleiman Nguroje, told Arewa PUNCH on Friday in an exclusive...